Drywall Installation in Thornhill for Small Areas
You have bare studs in one part of the house and need drywall installation in Thornhill for an area too small to interest a full boarding crew.
Yes. Small installs are a regular part of our drywall services: one basement wall, a new closet, a bulkhead around ductwork or a section of ceiling that was cut out. We hang the board, tape the joints, apply three coats of compound, sand and prime. Whole-house boarding and structural changes are outside what we do.
On this page
- The size of job we take, and what we don't
- Which board goes in which room
- What must be finished inside the wall first
- How many days hanging and finishing takes
Get a quote for this job
What counts as a small drywall install?
- A wall or two in a basement, or a partition someone has framed
- A closet built into a bedroom or hallway
- A bulkhead boxed around a duct, pipe or beam
- A ceiling section replaced after a leak or a repair above
- A wall rebuilt after old panelling or damaged board came out
Removing or cutting an opening in a load-bearing wall is not handyman work. It can need a building permit and an engineer or licensed contractor. Finishing a full basement can need a permit as well. West of Yonge Street ask the City of Vaughan, east of Yonge ask the City of Markham.

Which drywall goes where?
| Location | Board | Reason |
|---|---|---|
| Most walls | 1/2 inch regular | Standard on wood studs at 16 inch centres |
| Ceilings | 1/2 inch sag-resistant ceiling board, or 5/8 inch | Regular 1/2 inch can sag between joists over time, more so at 24 inch spacing |
| Bathroom walls outside the shower | Moisture-resistant board | Handles humidity, though it isn't waterproof |
| Inside a shower or tub surround | Tile backer board, not drywall | Drywall behind wet tile turns soft |
| Matching an existing wall | Whatever thickness is already there | A mismatch leaves a ridge at the joint |
Condo walls between units or facing the corridor are fire-rated assemblies that belong to the building. Changes to those go through your property manager, not through us.
What has to be done before the wall is closed?
Once board is up, everything behind it is hidden. So before we hang:
- Any wiring is complete, done by an ESA Licensed Electrical Contractor and inspected where required.
- Any plumbing is complete and has been tested under pressure by the plumber.
- On outside walls, insulation and vapour barrier are in, with the barrier sealed at seams and around boxes.
- Wood backing is in place wherever something heavy will hang later: a TV, a vanity, a grab bar, closet shelving.
- If the work is under a permit, the city's inspector has seen what needs to be seen.
Backing is the one people forget. A length of 2x6 between the studs now is far simpler than hunting for anchors later.
How long does hanging and finishing take?
Hanging is the quick part. A small area goes up in a day or less: ceilings first, then walls, with screws about every 12 inches on ceilings and 16 on walls, set just below the paper without tearing it.
Finishing sets the schedule. Tape coat, fill coat and skim coat each need drying time, roughly 24 hours apiece for premixed compound and longer in a cool basement. Then sanding and a coat of drywall primer. Plan on about four to five days from bare studs to ready for paint, with us on site for part of each day.
Running a dehumidifier or a fan in a basement shortens the wait. Turning up the heat to rush it can crack the compound.
Basements in Thornhill houses
Many 1960s to 1980s basements here are being finished or refinished for the second time. Two details matter below grade.
The board is held about 1/2 inch off the concrete floor so it can't wick up moisture from a damp slab or a minor spill. The baseboard covers the gap.
And if a wall shows white powder, staining or dampness on the concrete, that water problem is dealt with before anything is covered. Board over a wet foundation wall grows mould on its back face where nobody can see it.
Drywall Installation questions
Do you supply the drywall?
Sheets are 4 feet wide and usually 8 feet long, so check that they can reach the room.
Can full sheets get into a condo?
Measure the elevator first. An 8 foot sheet doesn't fit every cab, and your property manager may require the elevator to be booked and padded.
Is the new wall ready to paint when you leave?
It's sanded and primed. Two coats of finish paint go over that, by us or by you.
What finish do I need under tile?
Joints taped and one coat is enough behind a backsplash, since tile covers it. Painted areas need the full three coats.
Tell us the size of the area
Measure the wall or ceiling, photograph the framing and what's inside it, and send that through the quote form. Mention whether a permit is open on the work.